Toyota Yaris: Drivetrain / Axle And Differential
Other information:
INSPECTION PROCEDURE 1. INSPECT CYLINDER HEAD SUB-ASSEMBLY (a) Using a precision straightedge and feeler gauge, measure the warpage of the contact surfaces where the cylinder head sub-assembly contacts the cylinder block sub-assembly, intake manifold and exhaust manifold...
C..
Categories
Before refueling, close all the doors, windows, and the liftgate/trunk
lid, and switch the ignition OFF.
To open the fuel-filler lid, pull
the remote fuel-filler lid release.

To remove the fuel-filler cap, turn it counterclockwise.
Attach the removed cap to the
inner side of the fuel-filler lid.
read more