INSTALLATION
PROCEDURE
1. INSTALL GENERATOR WITH REGULATOR ASSEMBLY
(a) Temporarily install the generator with regulator assembly.
(b) Using an E8 "TORX" socket wrench, install the 2 stud bolts.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(c) Install the bolt.
Torque:
25 N·m {255 kgf·cm, 18 ft·lbf}
(d) Install the generator splash guard cover assembly to the generator with regulator assembly with the 2 nuts.
Torque:
25 N·m {255 kgf·cm, 18 ft·lbf}
(e) Connect the wire harness to terminal B with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(f) Close the terminal cap.
(g) Connect the 3 connector.
(h) Engage the clamp.
2. INSTALL V-RIBBED BELT
Click here
3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Click here
4. INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
HINT:
When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function thatcompletes learning when the respective system is used.
Click here
Before refueling, close all the doors, windows, and the liftgate/trunk lid, and switch the ignition OFF.
To open the fuel-filler lid, pull the remote fuel-filler lid release.To remove the fuel-filler cap, turn it counterclockwise. Attach the removed cap to the inner side of the fuel-filler lid.